|
Remodeling
A.F. Kuymar, Milwaukee Architect, submitted plans for remodeling the
church in the spring of 1935. A building committee composed of Harry
Pelzer, George A Reath, F.A. Buckreus and Walter Jordan, was appointed and
authorized by the congregation to proceed with those plans.
As a
result, the congregation celebrated its 15th anniversary with a rebuilt,
beautified colonial type church. The front was remodeled to accommodate
the choirs; the interior repainted, and new lighting fixtures added. The
building itself, became a churchly edifice by removing the overhanging
cornices and dormers, adding a tower and cross and green blinds to carry
out the colonial effect. The exterior was also painted, windows re-spaced
and amber cathedral glass installed.
Work
was also begun with the men of the church. The Men's Club was organized in
the winter of 1935, with regularly elected officers pledged to the work of
the church.
Rev. Lund's 1st Anniversary
Rev.
Lund observed the first anniversary of his pastorate with Redeemer Church
in 1935. He is beloved by the entire congregation, and through his zeal
and devotion, the congregation has made much forward progress during the
past year - organizations, church attendance, and love for the Lord's
work.
A "House of God"
Built on Solid Ground
The congregation gathered on Sunday, April 14, 1957 for the
groundbreaking of the new Redeemer Lutheran Church on Lincoln Avenue. The
Rev. P. Opem was assisted at the 3 P.M. ceremony by Rev. Amos G. Streich,
D.D., a previous pastor at Redeemer and current president of the Wisconsin
Conference, Northwest Synod of the Lutheran Church in America.
The
construction of the $127,500 edifice culminated three years of planning
and fundraising. The contemporary-style church was designed by Waterman,
Fuge & Associates, architect-engineers from Fort Atkinson. The D.M.
& C.M. Frey Co. was the general contractor.
The
church will seat 300 persons, with overflow for another 100. The present
Main Street building only holds 95 and will be sold to the Episcopal
Foundation of Milwaukee. The St. Aidan's Episcopal mission has been using
the building for over a year.
Construction
of the bi-level church will begin on April 15th. It will be built of brick
and stone - 38 x 102 ft. with a 36 x 65 ft. 10-classroom wing - situated
on a 185 x 590 sq. ft. lot. The slope of the hillside will be used to good
advantage, allowing ground-level entrance to the lower level. A 250-seat
fellowship hall will be located in the basement, as well as a fireside
room for youth groups and committee meetings. Pastor's office will be
located in a small, west wing and an overhanging roof will accommodate
parishioners during inclement weather.
 |
The
interior of the church proper will have laminated wood arches with cedar
decking between the beams. The chancel area will extend across the entire
width of the church and the chancel wall face with stone. A life-sized
wood cross will be suspended above a 9-ft. wide altar. |
|